West Bekaa Wastewater Project

 

 

 The contract consists of the following two main lots;

 

          A – Lot 1 : Sewer lines , consisting off :

 

  • Rehabilitation of existing sewer network , inlcuding CCTV survey , cleaning , repair or replacement of damaged pipes or manholes , connection to new sewer lines , inspection of system and all related civil works , and this in all the following areas : Joub Jannine , Lala , Kamed El Loz , Soultane Yaacoub El Tahta (Loussi) , Ghazze , Mansoura , Haouche El Harime , Kefraya , Aita El Foukhar , Main road el Establ – Ghazze .

 

          The total length of existing sewer lines to be rehabilitated & surveyed is around 70,000 L.M

 

  • Supply , installation & testing of new sewer lines , ranging from 200 mm to 600 mm diameter pipes , including all related civil works (excavation , bedding , backfilling , construction of manholes , road cutting and reinstatement … ) and this in all of the following areas : Joub Jannine , Lala , Kamed El Loz , Soultane Yaacoub , Loussi , Ghazze , Mansoura, El Khiara , Ed Dakoue , Haouch El Harime , Aammiq , Deir Tahnich , Aana , Tell znoub , Kefraya , Khirbet Qanafar , Manara , Aita El Foukhar , Saghbine , Bab Marea , Aazze , El Establ , Ain Zebdé .

          The total length of new sewer lines to be supplied and installed is around 180,000 LM , and the number on new manholes to be erested is around 4,700 manhole .

           The pipe material shall be UPVC pipes for diameters ranging from 200 to 315 mm , and concrete pipes for diameters above and including 350 mm .

 

  • Construct, equip and commission, nine lifting or pumping stations, including all civil, electrical, mechanical, instrumentation and control works, in the following areas: Ghazzé 1 , 2 & 3 , Haouch El Harimeh 1 & 2 , Manara , Mansoura, El Khiara, Deir Tahnich

  • Supply and install pressure lines made of ductile iron pipes, out of the pumping or lifting stations, in the following areas:  Ghazzé , El Khiara, Manara , Main road El Establ – Ghazzé, Deir Tahnich

  •  Operation and maintenance of the sewer systems mentioned above for two years

 

B – Lot 2 : Wastewater treatment plants

 

This lot consists of the design and build of two wastewater treatment plants at the following locations.

  • Joub Jannine : capacity 10,000 m3 / day

  • Saghbine : capacity , 560 m3 / day

The scope of works for both plants includes the following:

  • Civil Engineering works

  • Mechanical works

  • Electrical works

  • Design , operation and maintenance